You must be a CTBUH Member to view this resource.
Capital One Bank Tower
CM Tower, Calcasieu Marine Tower, Hibernia Bank Plaza
Building
Demolished
1983
Office
Composite
91.4 m / 300 ft
22
9
Construction Start
Completed
Demolished
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
09 September 2024
The 22-story Capital One Bank Tower in Lake Charles, Louisiana, was imploded on Saturday, 7 September after sitting vacant for nearly four years, marking the...
09 September 2024
The 22-story Capital One Bank Tower in Lake Charles, Louisiana, was imploded on Saturday, 7 September after sitting vacant for nearly four years, marking the...
27 August 2020
A Video showed powerful winds battering a building in Lake Charles, Louisiana, early Thursday morning, 27 August 2020, as Hurricane Laura caused extensive damage to...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy