You must be a CTBUH Member to view this resource.
H-Infinity Tower II
Building
Canceled
Residential
All-Concrete
50
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
28 January 2020
The Tel Aviv Magistrates Court ruled on 27 January 2020 that Africa Israel was the winner of the auction to purchase a land parcel in...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy