Population
741,636 (2023)
First 150m+ Building
Tallest Building
by no. of 150m+ completed buildings
Tallest City in
the World
Tallest City in
Tallest City in
RANK
|
Name
|
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Proposed Vision Never Completed Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Height
|
---|---|---|---|
1 | Rembrandt Tower | 150 m / 492 ft | |
2 | Mondriaan Toren | 123 m / 404 ft | |
3 | Maritim Congress Hotel | 114 m / 374 ft | |
4 | Amsterdam Symphony I | 105 m / 344 ft | |
5 | Amsterdam Symphony II | 105 m / 344 ft | |
6 | World Trade Center Tower H | 105 m / 344 ft | |
7 | ABN AMRO World HQ | 105 m / 344 ft | |
8 | Overhoeks Residential Tower | 104 m / 341 ft | |
9 | Amsteltoren | 103 m / 338 ft | |
10 | Ito-toren | 100 m / 328 ft |
Logo
|
Name
|
Level
|
# of 150m+ buildings
|
|
---|---|---|---|---|
![]() |
Arup |
Platinum
|
469 | CIV • STRC • WIND • ENVE • PMNG • COST • FAC • FIRE • MEP • VERC |
![]() |
Dam & Partners Architecten |
Silver
|
2 | ARCH |
![]() |
Haskoning |
Silver
|
10 | CIV |
![]() |
UNS |
Silver
|
19 | ARCH |
Tall Timber: A Global Audit
26 June 2017
The CTBUH has produced its latest Tall Buildings…
1995 Amsterdam 5th World Congress: Habitat and the High-Rise
14-19 May 1995
1995, The 5th World Congress was held in…
23 May 2022
Well House, Amsterdam: Steel Beams & CLT Floors
To maintain to a floor-to-ceiling height of 2.9 meters that was adaptable to future demands for heating/cooling or smart grids, steel beams and CLT floors...
02 June 2025
Vertical Urbanism Index Case Study: Amsterdam & Rotterdam
Amsterdam is a global leader in sustainable urbanism, known for its human-scale planning, cycling infrastructure, and adaptive reuse of historic structures. While traditionally low-rise, the...
23 October 2024
Modernist Complex Redevelopment in Amsterdam is Complete
The renovation and transformation of Tripolis Park, originally designed by Dutch modernist architect Aldo van Eyck, has been completed by MVRDV for developer Flow. The...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy